Image
  • Home
  • Expertise
    • Architecture
    • Structural
    • Construction
  • About
  • Contact
  • Podcast
CALL US
portfolio
portfolio
portfolio
portfolio
Project info
Category : Architectural Projects, Architectural Services, Construction Projects, Industrial Projects, Structural Engineering, Structural Projects
Project detail

This fast track project was completed in just eight weeks to provide much needed support for the troops in Iraq. The Ladson, South Carolina project included 110,000 square feet of new assembly line with steel superstructure, foundations and utility support for the new line.  One of the plant’s buildings was redesigned as a testing lab for the new armored vehicles.  …

SHARE:
More detail

This fast track project was completed in just eight weeks to provide much needed support for the troops in Iraq. The Ladson, South Carolina project included 110,000 square feet of new assembly line with steel superstructure, foundations and utility support for the new line.  One of the plant’s buildings was redesigned as a testing lab for the new armored vehicles.  Berenyi Incorporated provided architectural and engineering design services as well as construction management services.

 

Previous
Next

Related

Lear Avenue Warehouse
Sumter Utilities Building
Industrial Warehouse
BOEING 787 Dreamliner Skills Training Center
Scout Boats Plant C
LAFARGE Cross Belt Analyzer

Leave a Comment Cancel reply

Image
  • Home
  • Expertise
    • Architecture
    • Structural
    • Construction
  • About
  • Contact
  • Podcast
Image
  • Home
  • Expertise
    • Architecture
    • Structural
    • Construction
  • About
  • Contact
  • Podcast
  • Home
  • Expertise
    • Architecture
    • Structural
    • Construction
  • About
  • Contact
  • Podcast