• End of existing PSE
  • Demolition of existing concrete
  • Grading at PSE area
  • East edge of PSE area
  • PSE area grading
  • Crane area asphalt demolition
  • Prepare crane building laydown area
  • Receive Crane Building
  • Work progressing at PSE
  • Camera condition of utilities
  • Reinforcement for Crane Building
  • Preparing Crane building forms
  • PSE foundations excavated
  • Removing existing doors from PSE
  • Crane building foundation progress
  • Building anchor templates (rain)
  • Pre tie mats at PSE area
  • Nearly ready for concrete at Crane building
  • Ready to pour Crane building foundation
  • Crane Building pour (4-28-12)
  • Finishing crane building pour (4-28-12)
  • Preparing new/existing bldg interface at PSE
  • Start crane building erection 5-2-12
  • Formwork around PSE 5-2-12
  • Crane building progress 5-3-12
  • Prepared to main PSE foundation
  • Begin 550 cyd (13,000sqft) foundation pour
  • Completed pour of PSE main building (5-8-12)
  • Excavation of PPD Foundation (5-14)
  • PPD Foundation prior to pour (5-18).
  • Priming Crand Building, 5-19.
  • PSE builiding going up, 5-21.
  • Remaining steel arrived on site, 5-21.
  • Steel erection, 5-21.
  • Heavy structural steel of PSE nearing completion, 5-22.
  • Roof purlins being installed, 5-23.
  • Crane building primed on site
  • Main PSE building framing 5-31-12
  • Crane building roofing installation
  • Staging dock foundation preparation 6-7-12
  • Crane building final paint coat progress 6-13-12
  • Pour staging dock 6-14-12
  • Curing compound on staging dock 6-14-12
  • PSE continued erection 6-21-12
  • PSE continued erection 6-21-12
  • Start erection of Pre Pack dock 6-27-12
  • One day erection at Pre Pack dock 6-27-12
  • Staging dock canopy erection progress 7-5-12
  • Catwalk at crane building progress, 7.14.
  • Catwalk progress, 7.15.
  • PSE roofing began, 7.16.
  • AFT door in-fill progress, 7.19.
  • AFT door in-fill, exterior complete on 7.20.
  • Stair tower erection at crane builiding, 7.21.
  • Crane Building catwalk and stairs complete, 7.22.
  • Progress on roofing at PSE, 7.25.
  • Opening cut into existing pallet enclosure, 7.25.
  • Knee walls at PSe complete, 7.26.
  • Knee walls at PSE complete, 7.26.
  • Wall sheathing begining
  • Paving around Crane Building
  • Finished paving around Crane Building 8-6-12
  • Electrical conduit installation at PSE
  • Sheathing at PSE progressing
  • Sheathing progressing at PSE
  • Electrical panels for PSE 8-13-12
  • Wall sheathing progess, 8-14.
  • Wall sheathing completed, 8-16.
  • Main feed wire ran and transformer installed, 8.28.
  • Overhead doors installation complete and sprinkler piping arrived on-site, 8-30.
  • Installing fan at PSE.
  • Lifting crane into position.
  • Installing existing sliding doors at end of PSE.
  • New PSE with racks
  • Staging Dock canopy with conveyors
  • View from second floor rack aisle
  • Pre Pack Dock

McGuire AFB Pallet Storage Enclosure

New Jersey

 

The addition to the existing Pallet Storage Enclosure at McGuire AFB is a Design-Build project where Berenyi was asked by ICM Airport Technics, an equipment manufacturer from Viernheim Germany, to serve as the building designer and installation contractor. ICM's scope is to manufacturer and install the pallet handling equipment within the building Berenyi constructs. Design started in earnest in early 2011 and progressed through the entire year. Berenyi is responsible for the design of the enclosure's foundations, building architecture and structure, electrical and mechanical designs, as well as civil design around the facility. Also included in our Design-Build scope is a second 3,600 SF "Crane" building that is used to load and unload oversized pallets of goods that are transported as part of the base's operations.

In March of 2012 construction of the 30,000 SF addition started. Progress will be updated throughout 2012.

Services Provided (click service below to browse projects)

Civil Engineering Construction Management Construction Services Drainage Control Systems Facility Design Facility Upgrades Foundation Construction General Contractor Heavy Industrial Construction Heavy Structural Steel Industrial Building Engineering Industrial Engineering Material Handling New building Construction Nucor Building Systems Packaging Facilities Site Improvements Steel Erection Structural Design Structural Engineering Turn Key Installations Turn Key Projects