More detail

Berenyi Inc. provided structural design services for a 185ft tall hot-dipped galvanized structural steel tower. The design included precast concrete piles and 236 tons of steel. The design also took into account the equipment installation and sequencing.

Project info
Category : Industrial Projects, Structural Engineering, Structural Projects
SHARE: