More detail

Berenyi Inc. performed structural engineering and contractor services for a 260ft long building infill between two existing structures to provide a shade and shelter for weather sensitive product. The complexity of the project was in ensuring the building fit within 6 inches of each structure to allow for the building to end underneath each existing structure eave to capture precipitation and allow for proper flashing.

Project info
SHARE:

Leave a Comment